On this page

A heavy equipment inspection checklist is the walk-around an operator does before a shift: with the engine off, look for leaks, cracks and wear; in the cab, check the belt and safety gear; then run the engine and test the brakes, controls, horn and backup alarm. It takes 10 to 15 minutes. Anything that fails a safety line stays parked until it’s fixed.

How we researched this: the Occupational Safety and Health Administration’s (OSHA) own pages for 29 CFR Part 1926, plus Bobcat, Volvo and Genie guidance, November 2026.

For crews and yards with 5 to 30 machines. Forklifts and road trucks have their own checklists: our forklift inspection checklist and DOT inspection checklist. To turn a failed line into a repair job, GoodTaco’s work order template keeps each machine’s history.

What goes on a heavy equipment inspection checklist?

The operator manual is the final word on your machine, so treat this as the common core. Print the PDF and use one sheet per machine per shift, in three passes: engine off and walking (lines 1 to 15), in the cab (16 to 19), then engine running (20 to 27). Tick OK, Defect or N/A on each line. A tagged out machine has a “do not operate” tag on its controls and the key pulled; the sheet has a box for it.

Line 7 covers grease points, and line 27 is for site work: overhead lines and buried utilities marked (N/A when there are none). OSHA’s rule for power lines is to keep equipment at least 10 feet from lines rated 50 kilovolts or below, and farther from higher-voltage lines (1926.600(a)(6)). This table says what counts as a defect on the lines that get missed most.

LineMark Defect if you see
1 LeaksWet or dripping oil, hydraulic fluid, coolant or fuel on the ground or the machine
2 Hoses and fittingsWeeping, cracks, bulges, rubbing, loose fittings, or oil residue running down the boom
3 Cylinders and rodsAn oil film on a rod, scoring, a wet seal
4 Boom, arm, lift armsCracks, damaged welds, bent metal, especially around the mounts
5 Bucket, teeth, edgeMissing or loose teeth, an edge worn to the base, cracks
6 Coupler and lock pinLock pin missing, coupler won’t lock, dirt packed in the coupler
7 Pins, grease pointsA missing retainer or clip, play, a dry pin or grease point (grease it)
8 Tracks or tiresLoose or missing track bolts, damaged shoes, cuts, low tires
16 ROPS or canopyCracks, dents or loose mounts on the rollover protective structure (ROPS)
17 Seat beltFrayed webbing, a buckle that won’t latch
18 Controls, lockoutA control that sticks, or a lock lever that doesn’t lock them out
22 Backup alarmSilent, or too quiet to hear over the engine
27 Overhead lines, utilitiesPower lines in reach, or buried utilities not marked for today’s work

Walk the machine the same way every morning, such as clockwise from the cab door, so a missing item stands out. Look under it, not just at it. If the machine has a battery switch, turn it on before you climb in. Volvo’s prestart guidance for excavators runs through the compartments, boom and arm, cylinder mounts, undercarriage, cab filter, hoses and safety equipment in much this order (Volvo CE).

Never run a bare hand along a hose to find a weep. Fluid under pressure can get through skin from a pinhole leak you can’t see. Use a piece of cardboard, check your manual, and get medical help at once if fluid does get in.

What’s different for an excavator, wheel loader, skid steer, backhoe or telehandler?

Add these lines to the core list. Write them in the defects and add-on lines box at the bottom of the form.

MachineAdd these lines
ExcavatorBoom and stick cracks; track chains, shoes and bolts; swing and travel motors for leaks; quick coupler lock pin in place
Wheel loaderBucket edge and teeth; bucket pin clips; articulation joint and frame area, as your manual describes; tire cuts, inflation and rims
Skid steer or compact track loaderQuick-attach latch fully engaged; lift arm and hoses; track tension and a clear belly pan on track machines
Backhoe loaderStabilizer cylinders and pads; loader and hoe pins; boom and swing lock pins set before travel, as your manual says; seat belt
TelehandlerLoad chart legible and in place; boom and wear pads; outrigger housings and footpads, if fitted; forks or attachment

The telehandler line comes from Genie’s daily inspection list; your manual may add more. A few of the others are worth a sentence each:

  • Excavator quick couplers. In a 2005 safety bulletin, OSHA counted 15 incidents since January 1998 in which an excavator bucket released from a quick coupler without warning, and eight workers died. It points to couplers that weren’t fully engaged or had no locking pin in place, and it tells employers to follow the manufacturer’s instructions for installing, testing and inspecting them (OSHA bulletin). Make line 6 a real check: pin in, and a bucket test every time you change tools.
  • Skid steer attachments. Bobcat says to confirm both locking wedges are fully engaged before you move, and that a locked attachment shows no movement when it’s tilted gently against the coupler face (Bobcat).
  • Track tension. Bobcat’s compact track loader guidance says to compare track deflection with the range in the operator manual, and to check again after working in wet clay or packed soil (Bobcat).

What do you do when a line fails the check?

  1. Stop. The operator doesn’t start work. Park the machine, set the parking brake and put the bucket or blade on the ground, as OSHA’s rule for parked equipment asks (1926.600(a)(3)).
  2. Tag it and take the key. OSHA’s rule for equipment that doesn’t meet Part 1926 is to tag it or lock its controls so it can’t be used, or remove it (1926.20(b)(3)). We apply that to any failed safety line.
  3. Report it the same day. Write the line number and what you saw on the sheet, and tell the equipment manager.
  4. Fix and re-check. A qualified person repairs it, then someone other than the repairer looks at the line again and signs.
  5. Release it. Write the date back in service on the sheet and take the tag off.

Not every defect parks a machine. This is our suggested rule, not OSHA’s; your manual and your safety lead decide.

DefectOur rule
Hose weeping or leakingTag out until replaced
Lock pin missing, or coupler won’t lockTag out until fixed
Seat belt frayed or won’t latchTag out until replaced
Backup alarm silentFix before the shift, or back up only with a signal person
Teeth worn, mirror crackedWork, and schedule the fix this week

For the alarm, 1926.602(a)(9)(ii) says earthmoving or compacting equipment with an obstructed rear view can’t be backed up unless it has a reverse signal alarm or someone signals that it’s safe.

How does a rental yard use the same sheet?

Run it twice: at check-out and again at return. Write Out or Back and the hour meter in the Rental box at the bottom of the sheet (the Excel log has an Out or Back column); the difference is the hours the customer ran it. Photograph any damage at return before the customer leaves, and note it in the same box. A defect found at return gets the same tag-and-report steps. Contracts, rates and billing are in our heavy equipment rental software guide.

Does OSHA require a daily heavy equipment inspection?

No OSHA rule says “inspect an excavator daily,” but the general duty to inspect equipment and keep it safe covers it. For construction, these are the paragraphs that matter, from 29 CFR Part 1926. This isn’t legal advice.

ParagraphWhat it says
1926.20(b)(2)Safety programs include frequent and regular inspections of job sites, materials and equipment by competent persons the employer designates
1926.20(b)(3)Equipment that doesn’t comply with Part 1926 can’t be used; tag it or lock its controls, or remove it
1926.601(b)(14)Start-of-shift check on motor vehicles on an off-highway jobsite, such as dump trucks; defects fixed before use
1926.602(a)(2), (b)(1)Seat belts on covered earthmoving equipment with a ROPS or canopy, and on tractors with backhoe attachments
1926.602(a)(9)A horn on bidirectional machines such as loaders and bulldozers; a reverse alarm or signal person when the rear view is blocked
1926.1000 to 1926.1003Rollover protection for loaders, dozers, graders, tractors and rubber-tired skid steers made after July 15, 2019

Section 1926.601 says it doesn’t apply to equipment that 1926.602 covers. Paragraph 602(a)(1) names loaders, dozers, graders, tractors and similar equipment, not excavators, and backhoes appear only as attachments on tractors. Which rule an excavator falls under isn’t spelled out, so ask OSHA or your state. Section 602 sets no inspection schedule, so for most machines the daily walk-around rests on 1926.20(b)(2), the manufacturer’s manual and your own policy.

Neither 1926.20(b)(2) nor 1926.601(b)(14) says the check has to be written down or sets a keep-for period. A signed sheet is how you show it happened, and how a defect gets an owner. Trench inspections are a different job: a competent person checks the excavation each day under 1926.651(k). State plans and non-construction work may follow other rules.

How is a daily check different from a service interval?

The walk-around finds problems. Service prevents them. They run on different clocks and belong to different people.

JobWho and how often
Daily walk-aroundOperator, before each shift, 10 to 15 minutes
Grease pins and wear pointsOperator or mechanic, every ten operating hours, or the start of each day, per Bobcat; your manual rules
Oil, filters, hydraulic serviceMechanic, by hour meter, from the manual
Track tensionOperator or mechanic, per the manual, and after wet clay or packed soil

Bobcat describes the pre-shift walk-around as about 10 to 15 minutes, covering fluid levels, tires, the air filter indicator and the cooling fins (Bobcat). That’s for a skid steer; an excavator with a bucket change can run longer. Write the hour meter on every sheet, since that’s what tells you when service is due. Our preventive maintenance checklist covers building those schedules.

How do you keep inspection records by machine?

One row per machine per shift, kept where the next person can find it. Six columns carry it: date, machine, operator, hour meter, result and, for a defect, the work order number. A fleet of six machines working 22 days a month is 132 walk-arounds a month, or 22 to 33 hours of operator time at 10 to 15 minutes each. Keep a machine’s sheets at least until its next service clears them, and ask your insurer how long they want them.

Here’s an example of one Thursday’s sheets, with made-up machines:

Machine and hour meterResult
EX-01 excavator, 4,318.5 hDefect: hose weep at stick cylinder (WO-1624)
SS-02 skid steer, 2,046.0 hOK
WL-03 wheel loader, 6,772.2 hDefect: backup alarm weak (WO-1625)
BH-04 backhoe, 5,190.4 hOK
EX-05 mini excavator, 1,203.8 hOK
CT-06 track loader, 987.3 hDefect: track tension loose (WO-1626)

Turn failed walk-around lines into repair jobs with GoodTaco

The sheet stays on the machine. The defect it finds needs an owner and a date. Take EX-01’s hose weep: in the work order template it becomes WO-1624, Urgent, due the same day, with the machine, what the operator saw and who fixes it. Sign up free and you get your own copy, with sample records you can rename or clear. Ask for yard changes in plain words:

On the request page, call Building “Job site” and Unit or room “Machine”. Add Hour meter to each machine, and a Daily check list with machine, date, operator, hour meter and result. Let me add a photo to a work order.

  • Machines as equipment, each with its make, model, serial number and its own work order history.
  • Four priorities: Urgent is due the same day, High the next day, Normal within 7 days and Low within 14.
  • A request link for a foreman to report a defect from a phone. Only people signed in to your workspace can open the board and the work orders; anyone else with the link gets the request page and nothing more, once the app is published with its public link.

Weekly greasing or a monthly service can be a repeating job. Each work order is created 7 days before it’s due by default, when someone on your team who can edit opens the app. Every version is saved, so you can roll back with one click, and the app opens in any browser, including a phone’s.

GoodTaco is free to start. Paid plans start at $9 a month, and Pro at $49 a month includes 10 users; bigger teams talk to us about Enterprise.

If your machine list already lives in a spreadsheet, try our spreadsheet to app upload. No account is needed, and the records go into the app’s own built-in database.

Give every failed walk-around line an owner and a date. Start free.

Frequently asked questions

What should be on a heavy equipment inspection checklist?

With the engine off: leaks, hoses, cylinders, boom and arm, bucket and teeth, the quick coupler and its lock pin, pins and grease points, tracks or tires, fluid levels, the radiator and air filter, glass and mirrors. In the cab: the rollover protective structure (ROPS) or canopy, the seat belt, the controls and lockout. With the engine running: gauges, horn, backup alarm, lights, brakes, steering, the work controls and, on site work, overhead lines and marked utilities. Add lines for the machine type, and follow the operator manual first.

How often should heavy equipment be inspected?

The operator walks around it before each shift, which takes 10 to 15 minutes on a skid steer by Bobcat's own guidance. Greasing and fluid checks follow the manual, for example every ten operating hours on Bobcat loaders or at the start of each day. Service by hour meter, such as oil and filters, is a separate job for a mechanic and follows the manufacturer's schedule.

Does OSHA require a daily heavy equipment inspection?

No OSHA rule says to inspect an excavator daily, but the general duty to inspect equipment covers it. For construction, 29 CFR 1926.20(b)(2) requires safety programs with frequent and regular inspections of job sites, materials and equipment by competent persons. The one paragraph that lists a check at the start of each shift, 1926.601(b)(14), covers motor vehicles such as dump trucks on an off-highway jobsite, not equipment covered by 1926.602. Which rule an excavator falls under isn't spelled out, so ask OSHA or your state. State plans and non-construction work may differ.

What do you do when a heavy equipment inspection finds a defect?

Stop work on that machine, park it with the bucket on the ground and the parking brake set, tag it and take the key, and report the defect the same day. OSHA's rule for equipment that doesn't meet Part 1926 is to tag it or lock its controls so it can't be used, or remove it (1926.20(b)(3)); we apply that to any failed safety line. Put the machine back in service only after a qualified person has fixed it and someone has re-checked it.

What is different about an excavator inspection?

Add the boom and stick (look for cracks), the track chains, shoes and bolts, the swing and travel motors, and the quick coupler. OSHA's 2005 safety bulletin on quick couplers counted 15 incidents since January 1998 in which an excavator bucket released unexpectedly, and eight workers died. It urges employers to follow the manufacturer's instructions for the coupler, including its manual locking pin.

Is a daily inspection the same as preventive maintenance?

No. The daily inspection is a quick look by the operator to catch leaks, damage and failed safety devices before work starts. Preventive maintenance is scheduled service by hour meter or calendar, such as oil and filter changes and track tension, done by a mechanic from the manufacturer's schedule. The daily check feeds it: a defect found on the walk-around becomes a repair job.

Free template

Start from the work orders template

Get your own copy of a working work orders app with sample records, ready to make yours. Free to start.

Use the template, free

Or turn your own sheet into an app

Keep exploring

Related guides and templates

View all articles

Guide

OSHA inspection checklist: a free monthly self-inspection

A free OSHA inspection checklist to print: nine areas to walk each month, OSHA's most-cited standards, what an inspection looks like, and how to fix findings.

Industry

Supply Chain Software Built From Your Spreadsheet

Build supply chain management software from the spreadsheets your team already runs, purchase orders, vendor tracking, risk flags. No ERP migration. Deploy in minutes.

Industry

Dispatch Software for Small Business

Build dispatch software and a shipment tracking system from the spreadsheets your logistics team already runs. No developer required.

Template

Work order app template: track every maintenance job

A ready-made work order tracking app: take repair requests from a link, assign technicians, track each job to done and see what it cost. Free to start.