Section 8 inspection checklist: what landlords need to know before NSPIRE
A room-by-room Section 8 inspection checklist for landlords, how NSPIRE replaces HQS by February 1, 2027, and the 24-hour and 30-day deadlines after a fail.
Start from the work orders template
Take requests, assign jobs, track them to done.
On this page
A Section 8 inspection checklist is what a housing authority inspects before a voucher tenant moves in and at least every two years after. It covers alarms, electrical, plumbing, heat, doors, windows, mold and pests. A life-threatening fail must be fixed within 24 hours of the housing authority’s written notice; any other fail gets 30 days.
This guide is for small landlords with Housing Choice Voucher tenants, the program most people call Section 8, and the managers who run their units. The U.S. Department of Housing and Urban Development (HUD) is replacing the old Housing Quality Standards (HQS) with NSPIRE, the National Standards for the Physical Inspection of Real Estate, and housing authorities must switch by February 1, 2027. Below: what to do first, a room-by-room list for HQS and NSPIRE inspections, what changes, and what happens after a fail.
What to do first
- Call your housing authority. Ask which standard it uses today, HQS or NSPIRE, which checklist, and when your unit is due.
- Walk your unit with the checklist below, a week or more ahead. Print it, tick every line and list each fail.
- Fix the 24-hour items first: alarms, outlet cover plates, heat, blocked exits and gas.
- Fix the rest and photograph each repair. Some housing authorities accept photos instead of a second visit.
- Keep the fixes somewhere better than a text thread, such as GoodTaco’s work order template.
How we researched this: checked November 2026, in HUD’s own notices and checklists, including Notice PIH 2026-18 (HUD’s Public and Indian Housing notice, July 15, 2026), and in the Code of Federal Regulations (CFR) on eCFR. Housing authorities set some rules themselves, so ask yours which standard and form it uses today. This guide isn’t legal advice.
What is on the Section 8 inspection checklist?
Print this page and walk your own unit before the housing authority does. The checklist is about three pages, and the printout adds a line for the unit and date and a repair list. The tables follow HUD’s NSPIRE inspection checklist for voucher programs and the NSPIRE standards, version 3.0 behind it (sizes and distances come from the standards), reworded for a landlord. If your housing authority is still on HQS, the same walk works: HQS covers most of these items.
Items marked 24 hours: are life-threatening. Every other fail listed is a 30-day fail; severe and moderate get the same 30 days, so the tables don’t separate them. The clock runs from the housing authority’s written notice, not from your own walk, so fix what you find now anyway.
Every room
| Check | It fails if |
|---|---|
| ☐ Smoke alarms | 24 hours: An alarm is missing where one is required, covered, or silent when you press the test button |
| ☐ Carbon monoxide alarms | 24 hours: One is missing near the bedrooms where it’s needed (a gas, oil or wood appliance or fireplace, or the unit is right above or below an attached garage that isn’t ventilated), blocked, or silent when tested |
| ☐ Outlets and switches | 24 hours: A cover plate is missing, wiring shows, or one has burn marks or is broken |
| ☐ Outlets that don’t work | An outlet has no power, or a three-prong outlet isn’t wired to ground (test it with a plug-in tester) |
| ☐ Power in each room | A bedroom, living room or kitchen has neither two working outlets nor one working outlet plus a ceiling or wall light |
| ☐ Walls, ceilings and floors | A wall hole is over 2 inches across, a ceiling has a hole or a loose surface, or a floor is worn through to bare boards |
| ☐ Windows | One won’t open and stay open, won’t close, or can’t be locked |
| ☐ Trip hazards | A floor or walkway has a trip hazard |
| ☐ Leaks | A pipe or fixture drips, or water comes through a wall or ceiling |
| ☐ Mold and damp | Mold-like patches in one room add up to over 4 square inches (24 hours: over 9 square feet), or a moisture reading is high |
| ☐ Pests | You find any sign of mice, rats, cockroaches or bedbugs, such as droppings, chewed holes, a live or dead pest, urine or blood trails, shed skins or egg cases |
| ☐ Peeling paint | In a home built before 1978 where a child under 6 lives, any paint is peeling, chipping or cracked. Fixes must follow HUD’s lead-safe rules, so ask a lead-certified contractor first |
HUD’s rule asks for a smoke alarm on each level, inside each bedroom, within 21 feet of each bedroom door along the way you’d walk, and on the living-area side of a door that closes off the bedroom hall (24 CFR 5.703(d)(3)). HUD’s checklist fails a missing alarm only when none is inside the bedrooms, none outside them and none on the level, but the rule asks for all of them, so install all of them.
Since December 29, 2024, federal law also requires smoke alarms to be hardwired or sealed 10-year battery units, whichever standard your housing authority uses (Notice PIH 2026-18, section IV.D). Ask whether an older battery alarm that works still passes.
Kitchen
Outlets near sinks and tubs must be GFCI (ground-fault circuit interrupter) outlets: the ones with TEST and RESET buttons.
| Check | It fails if |
|---|---|
| ☐ Sink | The taps won’t turn on or off, there’s no hot water, it won’t drain, it leaks, or it’s pulling away from the wall |
| ☐ Stove or oven, if you provide it | The oven or cooktop doesn’t heat, a burner is dead, or a broken part makes it unsafe to use. One that was there and is gone fails too |
| ☐ Refrigerator, if you provide it | It doesn’t keep food cold, a part is broken, or one that was there is gone |
| ☐ Outlets near water | An outlet within 6 feet of the sink isn’t GFCI protected, or its test button doesn’t work (press TEST: it should cut the power) |
| ☐ Light | There’s no permanent light fixture, or the fixture doesn’t work or isn’t secure |
| ☐ Food prep and storage | There’s no space to prepare or store food, or a cabinet is broken |
Bathroom
| Check | It fails if |
|---|---|
| ☐ Toilet | It won’t flush, rocks at the base, or can’t be used in private. If it’s the only toilet, broken is a 30-day fail and missing is a 24 hours: fail |
| ☐ Tub or shower | It won’t drain, a part is missing, or it can’t be used in private |
| ☐ Sink and hot water | The taps won’t turn on or off, there’s no hot water, or it won’t drain |
| ☐ Fan or window | The exhaust fan doesn’t run or is clogged, or there’s no fan and no window that opens |
| ☐ Outlets and light | An outlet within 6 feet of water isn’t GFCI protected, or there’s no permanent light fixture |
Doors, bedrooms and ways out
| Check | It fails if |
|---|---|
| ☐ Entry door | It won’t close or can’t be locked, or has a hole all the way through. A missing entry door is a 24 hours: fail |
| ☐ Interior doors | A door won’t open |
| ☐ Locks on ways out | 24 hours: A double-key deadbolt, or any lock that needs a key or tool to open from the inside, is on a door someone would use to get out or on a bedroom door |
| ☐ Path to the street | 24 hours: Furniture, storage or a keyed gate blocks the way from any room to the street |
| ☐ Bedroom windows | 24 hours: A bedroom window on the 3rd floor or below is blocked by a key-only lock, fixed security bars, a permanently installed window air conditioner or your furniture |
| ☐ Stairs and handrails | A step is broken, or a handrail is loose or has been taken off |
| ☐ Guardrails | 24 hours: A porch, deck or balcony more than 30 inches above the ground has no guardrail, or the guardrail is loose, damaged or under 30 inches tall |
Heat, hot water and utilities
| Check | It fails if |
|---|---|
| ☐ Heat, October 1 to March 31 | 24 hours: The built-in heat doesn’t work, or a room with an outside wall reads under 64°F with it running. 64 to 67.9°F fails at 30 days |
| ☐ Heat, April 1 to September 30 | A built-in heat source is broken, missing or not installed (30 days) |
| ☐ Space heaters | 24 hours: An unvented heater that burns gas, oil or kerosene is in the home. Portable electric heaters, fireplaces and wood stoves don’t count as the heat source |
| ☐ Furnace or boiler | 24 hours: The exhaust vent is blocked, loose or disconnected, or the combustion chamber cover or gas shutoff valve is missing |
| ☐ Air conditioning | A unit you provide doesn’t turn on, or only blows warm air |
| ☐ Water heater | No hot water, or the relief valve leaks (30 days). 24 hours: The flue pipe is blocked or loose, or the gas shutoff valve is missing |
| ☐ Fire hazards | 24 hours: Anything that can burn is on or within 3 feet of a heater or gas water heater, or gasoline, propane or kerosene is stored indoors |
| ☐ Gas smell or leak | 24 hours: Any gas, propane or oil leak. Call the gas company first |
| ☐ Breaker panel | 24 hours: A breaker or fuse is damaged. Something blocking the panel is a 30-day fail |
| ☐ Dryer vent | 24 hours: The duct behind a dryer you provide is detached, clogged or made of an unsuitable material |
| ☐ Fire extinguishers you provide | 24 hours: The gauge is out of the green, the tag is missing or expired, or an empty bracket shows where one used to hang |
Our fire extinguisher inspection checklist covers the monthly check and the yearly service.
Outside, if you own the building
For a house or small building, the inspector also looks at the way from the front door to the street and the parts of the building that serve the unit (24 CFR 5.703(a)).
If the roof is part of the fix, our roof inspection checklist shows what a roofer checks.
| Check | It fails if |
|---|---|
| ☐ Roof and gutters | The roof has a hole or damage, water stands on it, or a gutter is broken or blocked |
| ☐ Outside walls | Siding is missing in a patch of 1 square foot or more on a wall, or paint is peeling on 10 square feet or more |
| ☐ Walkways and steps | A path, step or ramp is broken or blocked, or has a trip hazard |
| ☐ Outdoor outlets and lights | An outdoor outlet within 6 feet of water isn’t GFCI protected, or a light fixture is broken or loose |
This list isn’t HUD’s. Your inspector works from HUD’s checklist or your housing authority’s own version, and HUD can approve local variations, so ask yours for its list.
NSPIRE leaves out housekeeping and cosmetic condition, which a move-in and move-out check for a deposit should record. HUD’s landlord forms page has a form for that, and our rental property inspection checklist has move-in and move-out sheets to print. It doesn’t replace an inspection.
HUD gives every item one of four ratings, and only the lowest passes.
Here is one landlord’s own walk of one unit, finished. These are items that would fail, not a countdown: the housing authority’s notice starts the clock. WO-1201 to WO-1206 are the work orders logged for them, shown in the last section.
How do you pass a Section 8 inspection the first time?
Fix the 24-hour items first, then settle who supplies what. Your lease and the housing assistance contract say who provides each appliance and pays each utility, and many tenants bring their own stove or refrigerator. Under 24 CFR 982.404(b), the housing authority can hold the family responsible for a fail caused by:
- A utility the tenant pays for that is shut off.
- An appliance the tenant is to provide that is missing or broken.
- Damage beyond normal wear by the household or a guest.
Ask your housing authority which appliances you must provide.
What are the NSPIRE inspection standards, and what changes from HQS?
NSPIRE stands for the National Standards for the Physical Inspection of Real Estate. HUD’s 2023 NSPIRE rule redefines HQS as HUD’s new NSPIRE standards, now at version 3.0. HUD has moved the date housing authorities must use them three times: to October 1, 2024, then October 1, 2025, and now February 1, 2027 (90 FR 46911), unless HUD moves it again. Notice PIH 2026-18 confirms the date and lets a housing authority keep using HQS until then, while encouraging it to switch sooner.
So your unit may be inspected under either one today. A housing authority that adopts NSPIRE must tell owners when it takes effect (Notice PIH 2026-18, section V.B). If your unit failed before yours switched, the reinspection uses the old rules, since a unit is held to the standard in effect on the day it was inspected (section IV.C). Local codes still apply to you, since HUD’s standards don’t replace them (24 CFR 5.703(f)).
Four changes are most likely to catch a landlord: GFCI outlets near water, the winter heat numbers, any sign of a pest, and mold counted by size.
| Was under HQS | Now under NSPIRE |
|---|---|
| The standard: one section of the regulations (24 CFR 982.401, as it read in 2023) with broad words like “adequate” | A written rule for each item, with criteria and a rating. Low items don’t fail the unit |
| The neighborhood: noise, traffic and air quality counted | Gone |
| Judgment calls: left to the inspector | Measured: mold by square feet, holes by inches, heat by degrees. Housekeeping and cosmetics are out |
| Heat: “adequate” | A working built-in heat source from October 1 to March 31, and 68°F indoors. Under 64°F is a 24-hour fail, and 64 to 67.9°F a 30-day fail. A broken heat source fails the rest of the year too |
| GFCI outlets: not mentioned | An outlet within 6 feet of water must be GFCI protected, and a dead test button fails |
| Alarms: a smoke alarm on each level | Smoke alarms on each level, in each bedroom and within 21 feet of bedroom doors. Carbon monoxide alarms inspected since December 27, 2022. A separate federal law added hardwired or sealed 10-year battery alarms on December 29, 2024, under either standard |
| Mold: never named | Named and graded by size |
| Pests: “free of vermin and rodent infestation” | HUD lists what counts as evidence for each pest, such as a live or dead one, droppings, chewed holes, shed skins or egg cases |
| Fire safety: the regulation didn’t name fire doors, extinguishers or sprinklers | Each gets its own standard, where a building has them |
Who inspects, how often, and what the housing authority can do when a fail isn’t fixed stay the same. State and local codes still aren’t part of the voucher pass or fail.
What happens if your unit fails a Section 8 inspection?
The housing authority sends you the results in writing (24 CFR 982.404), and your deadline starts then, not when you or a tenant first spot the problem. It’s 24 hours for life-threatening items and 30 days for the rest, or longer if the housing authority approves it. It may hold payments back while you fix it, and its administrative plan says when. For lead paint, mold and pests, HUD lets a housing authority accept a temporary fix for a 24-hour item while a lasting one is arranged (Notice PIH 2026-18, section VII.G).
Here is the whole clock, with example dates:
In plain steps:
- Fix it and say so. Tell the housing authority when an item is fixed. Some accept photos instead of a second visit (982.405(i)). If you say it’s fixed, or time runs out, and it still fails on reinspection, it may charge a reasonable fee, which you can’t pass on to the tenant (982.405(h)). To ask for more time, many housing authorities have a form; expect to list the items and, for delays outside your control, supply third-party documents.
- Fixed by the deadline. Payments continue, and anything held back is paid.
- Not fixed. The housing authority must stop (abate) payments, including any it held back, and you aren’t paid for those months even if you fix the unit later. Count 60 days from the notice that payments have stopped, not from the first notice: for a 30-day item, the earliest the contract can end is about 90 days after the first one. Fix it within the 60 days and payments restart. If it still fails, the contract ends and the tenant gets a voucher to move. The housing authority can allow longer.
You can’t end the tenancy because payments were held or stopped (982.404(d)(3)). The tenant doesn’t owe you the housing authority’s share either. Under the housing assistance payments contract (form HUD-52641), the family isn’t responsible for it, and you can’t charge extra for it.
If the tenant or a guest caused damage beyond normal use, the housing authority may waive your duty to fix it, and then it can’t hold back or stop your payments. It can still act against the tenant’s assistance (982.404(a)(4)). Photograph damage and tell the housing authority.
These rules apply to housing assistance contracts signed on or after, or renewed after, June 6, 2024 (982.404(f)). A contract renews when it continues past the first lease term. Ask your housing authority if yours is older.
What are the Section 8 inspection requirements for landlords?
| Requirement | What it means |
|---|---|
| Before the lease starts | The unit must pass first, unless your housing authority lets one with no life-threatening fails start (982.305, 982.405(j)). It inspects within 15 days of the tenancy request if it has up to 1,250 voucher units |
| At least every 2 years | Every 3 at a small rural housing authority. It can inspect more often (982.405(b)) |
| A reported problem | A tenant or government official reports one: 24 hours if life-threatening, 15 days if not (982.405(d)) |
| What’s checked | The unit, the way to the street, shared rooms that go with it and equipment that serves it (5.703(a)) |
| Who inspects | Your housing authority, or a contractor or approved entity. Not HUD |
| What it costs you | Nothing for the inspection before the lease or the first one after it (982.405(h)) |
| Self-inspection | Not required of voucher owners (5.707). HUD encourages the routine checks you already do (Notice PIH 2026-18, section VII.F) |
Project-based vouchers, where the subsidy belongs to the unit rather than the tenant, follow the same notice. Other HUD-assisted housing has different rules, including scoring and yearly self-inspection, so ask your contract administrator if that’s you.
HQS inspection checklist or NSPIRE inspection checklist: which will your inspector use?
A housing authority still on HQS may use the HQS inspection checklist, form HUD-52580, and the inspection form HUD-52580-A, until it adopts NSPIRE or February 1, 2027, whichever is sooner. HUD says those forms don’t include the current smoke and carbon monoxide alarm requirements, so a housing authority still using them has to build those checks in itself. Once it adopts NSPIRE it may use HUD’s NSPIRE inspection checklist, or any tool that follows the current standards (Notice PIH 2026-18, sections XII and XIII). HUD’s NSPIRE page has the checklist in print, fillable and spreadsheet versions.
How do you keep track of inspection fixes?
A fail is only a problem if it gets lost. Four ways to keep track:
- A text thread or notebook. Free. Each fail lives on one person’s phone, and nobody can see what’s due when.
- A spreadsheet. One row per fail, sorted by due date. It works for a handful of units.
- Your property software. If you already use property maintenance software, check whether it tracks inspection fixes with due dates.
- A work order app. Each fail is logged as a work order with a priority, a person, a due date and a record of what was done.
To try the spreadsheet, paste this into cell A1 of a new sheet and format column E as a date. The formula works in Excel and Google Sheets.
Unit Item Rating Notice date Fix by Who Fixed on
412 Alder Street, B Smoke alarm silent, bedroom 2 24 hours 2026-11-20 =IF(C2="24 hours",D2+1,D2+30) Dale Foster
412 Alder Street, B Bathroom fan doesn't run 30 days 2026-11-20 =IF(C3="24 hours",D3+1,D3+30) Dale Foster
Type “24 hours” or “30 days” in Rating and the date of the housing authority’s notice in Notice date. Sort by Fix by to see what’s due first. Our work order template guide has a form to print, and the maintenance request form guide covers what tenants should tell you.
An app helps stop a fail from being forgotten.
Turn every fail into a work order with GoodTaco
Take the silent smoke alarm from the walk-through. In GoodTaco’s work order template you log it as WO-1201: a named person, a due date of today and a status, not a line in a text thread. Sign up free and you get your own copy, and you log each fail as its own work order. Its sample records are a small property maintenance team’s buildings; clear them with the button on the board, add each property as a site, and put the unit and room in the “where” line.
- Every fail gets an owner and a due date. Pick a priority and the due date fills in: Urgent the same day, High the next day, Normal within 7 days and Low within 14. You can change the date. Use Urgent for the 24-hour items, and for a true emergency such as a gas smell, phone someone first, then log it.
- Your handyman doesn’t need an account. Anyone you assign work to goes on the Team list by name and phone. To open the app themselves, they sign in to your GoodTaco workspace.
- Each property keeps its history. Open a site and you see its open work orders and recent finished ones. Finishing a job asks what was done, the hours and the parts cost. Take a photo of each repair on your phone, since some housing authorities accept one.
- Tenants can report problems. Publish the app with its public link, then share the request link, one for each property. Only people signed in to your GoodTaco workspace can open the board and the work orders. Anyone else who has the link gets the request page and nothing more. Add an emergency number to show at the top.
- Alarm tests get a due date. Add a repeating job. Each work order is created a set number of days before it’s due (7 by default) when someone on your team who can edit opens the app. It lands in the work order list and that technician’s My work. Our preventive maintenance checklist has jobs to start with.
To add an inspection checklist, ask GoodTaco in plain words:
Add a “Walk-through” page with the room-by-room checklist from the Section 8 guide. Each failed item becomes a work order for that unit, and every work order gets a “Housing authority deadline” date.
Every version is saved, so you can roll back with one click. The app opens in any browser, including a phone’s.
GoodTaco is free to start. Paid plans start at $9 a month, and Pro at $49 a month includes 10 users; bigger teams talk to us about Enterprise.
If your units and repairs already live in a spreadsheet, try our spreadsheet to app upload instead; no account needed, and the records go into the app’s own built-in database.
Get every fail fixed, on a due date, before the inspector comes back. Start free, no credit card needed.
Frequently asked questions
What is on a Section 8 inspection checklist?
Smoke and carbon monoxide alarms, electrical (outlets, cover plates, GFCI protection), plumbing and hot water, heat, doors and locks, windows, stairs and rails, mold, pests, and peeling paint in older homes, plus the roof and steps where they serve the unit. HUD's NSPIRE checklist for voucher units lists every item with its rating and its correction time.
What is the difference between HQS and NSPIRE?
NSPIRE, the National Standards for the Physical Inspection of Real Estate, replaces Housing Quality Standards (HQS) for voucher units. It writes a rule for each item with a rating (life-threatening, severe, moderate or low), measures what HQS left to judgment, such as mold by square feet and heat by degrees, and drops the neighborhood check.
When does NSPIRE start for Section 8 inspections?
Housing authorities can keep using HQS until February 1, 2027, and some have already switched. HUD has moved the date three times, most recently in September 2025, and Notice PIH 2026-18 (July 15, 2026) confirms February 1, 2027. Ask your housing authority which standard it uses on your unit today.
How long do I have to fix a failed Section 8 inspection?
24 hours for a life-threatening item and 30 days for other fails, counted from the housing authority's written notice. For the 30-day items, the housing authority can approve a longer period. Items rated low don't fail the unit and need no repair.
How often are Section 8 units inspected?
Before the lease starts, then at least every 2 years, or every 3 years at a small rural housing authority. A housing authority can inspect more often. When a tenant or a government official reports a problem, the housing authority inspects within 24 hours if it's life-threatening and within 15 days if it isn't.
What happens if my Section 8 unit fails and I don't fix it?
The housing authority may hold your payments back, and it must stop them (abate) once the deadline passes. You aren't paid for the months they were stopped, even if you fix the unit later. If the unit still fails about 60 days after the housing authority tells you payments have stopped (it can allow longer), it ends the contract and the tenant gets a voucher to move. You can't end the tenancy because payments were held or stopped.
How do I pass a Section 8 inspection the first time?
Fix the 24-hour items first: alarms, outlet cover plates, heat, blocked exits and gas leaks. Settle who supplies each appliance and which utilities the tenant pays, then walk the unit with a room-by-room checklist a week ahead and photograph every repair.
Start from the work orders template
Get your own copy of a working work orders app with sample records, ready to make yours. Free to start.
Use the template, free