Electrical work order: the form, permits and inspections for a small contractor
Free electrical work order form in Word, PDF and Excel, with permit and inspection fields, change orders, a facility safety checklist and software prices.
Start from the work orders template
Take requests, assign jobs, track them to done.
On this page
An electrical work order is the record of one electrical job: the customer and address, the problem or scope, the panel and circuits, the permit and inspection dates, what was done, the hours and materials, and who approved any extra work. Write it before you drive out and finish it before you invoice.
It’s for owners and office managers at electrical contractors with 2 to 15 electricians, and for the maintenance electrician at a facility. Below: the fields, where permits and inspections go, how to write up a quote or change order, a facility walk-through and what electrician software costs. For the general form, see our work order template; want it as an app? Try GoodTaco’s work order template.
How we researched this: checked November 2026 on OSHA, city and state permit pages and each company’s own pricing page. Not legal advice; your local permit office has the last word.
What goes on an electrical work order?
Most of the form is the same as any work order: number, date, who asked, where, what’s wrong, who’s assigned, what was done. Electrical work adds the fields below. Print the form and use one per job.
| Field | What to write |
|---|---|
| Job type | Service call, small job, quote or change order |
| Billed as | Time and materials, or a fixed quote with the amount |
| Panel | Where, make and amps |
| Circuits | Circuits and breaker sizes |
| Power off | Lockout and tagout applied, not needed, or live work approved |
| Permit | Required, not required or ask the local office; permit number |
| Inspections | Rough-in and final: requested, date, pass or correction |
| Materials | Item, quantity and cost |
| Close-out | What was found and done, labor hours, who approved extra work |
Write the panel location and circuit numbers on the order, because the next call to that address is usually about the same panel. And write the power-off line before work starts, not after. OSHA’s rule for general industry, 29 CFR 1910.333, says live parts must be de-energized before work unless that adds a hazard or can’t be done, and equipment that’s de-energized but not locked out or tagged must be treated as energized. Construction sites follow Subpart K, 29 CFR 1926.400 onward. For the steps from request to close, see what a work order is.
Working in a building you maintain? The fields change a little:
| In-house electrician | Instead of |
|---|---|
| Building, floor or department | Customer address |
| Cost center or charge code | Billed as |
| Contractor or in-house pulled the permit | Who pulls the permit |
What do permits and inspections have to do with a work order?
The permit is the part of an electrical job that someone else controls. Put the permit number and each inspection date on the work order, so the office knows what’s blocking the job without calling the crew.
Call the permit desk and ask three things: Does this job need a permit? Who pulls it, the contractor or the owner? Which inspections do you do, and how do I request them? The local authority having jurisdiction, usually a city or county building department or a state electrical office, decides all three. Ask whether a panel or service change adds a step, such as one with the utility.
Local rules differ. Washington State’s Labor and Industries says an electrical permit is required for most electrical work, and that whoever does the work is responsible for getting it before starting. It sets an inspection request deadline: 3 business days after finishing, or 1 business day after energizing any part, whichever comes first. Your city may say something else.
The usual stages. Boise, Idaho’s homeowner permit page lists a rough-in inspection, with conductors made up in boxes and no devices installed, then a final with everything installed, energized and working, and a correction inspection if the inspector leaves a notice. Raleigh, North Carolina lists rough-in, final and temporary pole inspections, and charges a reinspection fee if you cancel or reschedule on the day. A job like the basement finish above has three dates for the work order:
- Permit pulled. Write the number and the date.
- Rough-in inspection. Request it when the wiring is in, before walls close. Record pass, or keep the correction notice with the job.
- Final inspection. Request it when devices and fixtures are installed and energized. Don’t close the order until it passes.
Here is the office view of five example jobs on November 20, 2026. Three wait on the inspector, one waits on you and one needs no permit:
Put a job on hold in a “waiting on” state and write what it’s waiting on, such as “rough-in inspection”. The office can then see which jobs are stuck on the inspector and which are stuck on you.
Time and materials, a quote or a change order: how do you write each one?
The work order should say which one the customer agreed to. Your contract and your state’s rules decide the details.
| Job | Write on the order |
|---|---|
| Time and materials | Rate, minimum charge, markup on parts |
| Fixed quote | Scope in one line, price, what’s excluded |
| Change order | What changed, price, who approved, date |
On a service call, say the rate before you start and record who agreed to it. On a quote, list what’s not included: patching drywall, a new panel if the old one fails, permit fees if they’re separate. When the job changes, stop and write a change order, and attach it to the same job number so the invoice matches. A verbal yes with no record is the line you’ll miss when a customer disputes the bill.
Example: the basement job was quoted at a fixed price for a 60-amp subpanel and six circuits. When the homeowner added two exterior receptacles, the change order read “Add 2 exterior GFCI receptacles: 3 hours at $95 an hour, $285, plus $64 in parts, $349”, and the homeowner approved it by name and date before work started.
What goes on an electrical inspection checklist for a facility?
This is a different inspection from the permit inspection. It’s the visual safety walk-through a facility does on its own panels, cords and fixtures, or that a contractor offers a customer as a maintenance visit. It tests nothing and isn’t a code inspection. Print this page and tick one line per item:
FACILITY ELECTRICAL WALK-THROUGH
Site: ________ Date: ______
Walked by: ________
[ ] Panel and disconnect fronts clear, no storage
[ ] At least 3 ft of clear space in front of each panel (more on 277/480 V)
[ ] Every breaker and disconnect labeled
[ ] Panel covers on, no open knockouts
[ ] Junction and outlet boxes covered
[ ] No damaged cords, plugs or devices
[ ] No extension cords used as wiring
[ ] No cords run through walls or ceilings
[ ] GFCI protection on receptacles in bathrooms and on roofs
[ ] No warm, discolored or buzzing equipment
[ ] Exit and emergency lights work
[ ] Defects listed and work orders opened
The lines come from OSHA’s general industry electrical rules, Subpart S of 29 CFR 1910:
| Line | The rule behind it |
|---|---|
| Working space | 1910.303(g)(1): 3 ft deep at up to 150 volts to ground, 3, 3.5 or 4 ft at 151 to 600; 30 inches wide; no storage |
| Labels, damaged parts | 1910.303(f) and (b)(7)(iv): circuits marked; no damaged parts |
| Covers, openings | 1910.305(b): unused openings closed, boxes covered |
| Cords | 1910.305(g)(1)(iv): not fixed wiring, not through walls |
| GFCI | 1910.304(b)(3): 125 V, 15 and 20 A receptacles in bathrooms and on rooftops |
The warm-equipment and exit-light lines aren’t from Subpart S; they’re habits worth keeping. If something is hot, buzzing or smells burnt, stop and call an electrician. Subpart S covers installations in and on buildings and other premises, not vehicles (1910.302).
NFPA 70B. NFPA’s page calls it the Standard for Electrical Equipment Maintenance, lists a 2026 edition and says it covers preventive maintenance for electrical, electronic and communication systems and equipment, such as those in industrial plants, institutional and commercial buildings and large multi-family residential complexes. Whether you must follow it depends on who enforces it for your building, so ask them and read it on nfpa.org. For the service schedule itself, see our preventive maintenance checklist.
What does electrical work order software cost?
Most electricians start on paper or a spreadsheet and move to software when callbacks, permit dates and invoices stop fitting in one person’s head. Prices are as listed on each company’s US pricing page, November 2026, per month:
| Tool | Price as listed |
|---|---|
| Jobber | Connect, 5 users: $149 billed yearly, $199 monthly |
| Housecall Pro | Essentials, 5 users: $149 billed yearly, $189 monthly |
| Service Fusion | Starter, unlimited users: $220 billed yearly, $259 monthly |
| Workiz | No price listed; request a quote |
| ServiceTitan | No price listed; request a quote |
For a crew of five on yearly billing, that’s $1,788 a year at Jobber Connect or Housecall Pro Essentials and $2,640 at Service Fusion Starter. Jobber’s Grow plan for 5 users is $229 yearly, $299 monthly, and its Core plan is $29 yearly for 1 user. Plans in each family differ in features, so read what each tier includes. Housecall Pro showed a 50% off offer for 3 months, which we didn’t count.
Which we’d look at first. For two to five electricians who write service calls and small jobs, Jobber or Housecall Pro: both list prices and both offer a 14-day free trial with no credit card, per their pricing pages. Ask each the same two questions: where does the permit number go, and where do the rough-in and final dates go? If a tool has no place for them, you’d keep a list beside it. Service Fusion’s price includes unlimited users, so it’s worth a look with more electricians. ServiceTitan’s pricing page asks you to request a quote.
Track permits and inspections in GoodTaco
Take the remodel that keeps stalling on an inspector. GoodTaco’s work order template is a working app you can start free: sign up and you get your own copy, with sample records to rename or clear. Add each customer address and each panel. Put a job on hold with a reason like “Rough-in inspection”. Ask GoodTaco to add the permit fields:
Add a Permit number, a Permit status (not needed, requested, pulled), Rough-in inspection date and result, Final inspection date and result, and a Job type (service call, small job, quote, change order) to each work order. Add a Panel and circuits field. Show jobs waiting on an inspection in their own list.
- Each panel keeps its own work order history, so the next call to that address starts with what you did last time.
- A held job shows what it’s waiting on, and My work shows one electrician’s jobs at a time.
- Already keep jobs in a spreadsheet? Upload it and the rows go into the app’s own built-in database.
GoodTaco is free to start. Paid plans start at $9 a month, and Pro at $49 a month includes 10 users; bigger teams talk to us about Enterprise.
Know which jobs are waiting on the inspector before the customer calls to ask. Start free, no credit card needed.
Frequently asked questions
What is an electrical work order?
A written record of one electrical job: who it's for, where it is, what was asked for, which panel and circuits it touches, whether a permit is needed, what was done, the hours and materials, and who approved any extra work. It is the paper that follows a service call or small job from the first phone call to the invoice.
What should an electrical work order include?
The customer and job address, a job number, the problem or scope, how it's billed (time and materials or a fixed quote), the panel and circuits involved, the permit number and inspection dates when a permit applies, the work done, labor hours, materials, and the customer's approval of any change. Add safety notes such as lockout and tagout when the job needs them.
Do you need a permit for electrical work?
Often, but it depends on where the job is. The local authority that enforces the electrical code decides. Washington State's Labor and Industries, for one, says an electrical permit is required for most electrical work, with exceptions for like-for-like swaps. Other cities and counties set their own rules, so ask the local building or electrical inspection office before you start.
Who pulls the electrical permit?
It varies by state and city. In Washington State, whoever performs the electrical work is responsible for getting the permit before starting, and a permit bought by someone else isn't valid. Some cities issue separate homeowner permits. Check the local office's rules for contractors.
What inspections come after electrical work?
Most cities inspect in stages. A rough-in inspection happens after the wiring, boxes and panel are in but before the walls are closed. A final inspection happens when devices and fixtures are installed and working. Some places add service, temporary pole or correction inspections. Boise, Idaho and Raleigh, North Carolina both publish this list, and details differ by city.
What is an electrical inspection checklist?
A list for a visual walk-through of a building's electrical equipment: panels and disconnects with clear working space and legible labels, no open boxes or missing covers, no damaged cords or devices, no extension cords doing the job of permanent wiring, and GFCI protection on receptacles in bathrooms and on roofs. OSHA's electrical rules for general industry are in 29 CFR 1910 Subpart S.
Is NFPA 70B required?
NFPA 70B is NFPA's Standard for Electrical Equipment Maintenance, and NFPA lists a 2026 edition. Whether you must follow it depends on the local authority, your insurer and your contracts, not on a single national rule. Ask who enforces it for your building before you build a maintenance program around it.